Linea 3 of the Madrid Metro
LEER MÁSFCC will be responsible for the integration of Line 3 of the Madrid Metro in the planned remodelling of the Moncloa interchange which will extend the line to Cuatro Caminos (connections with lines 2, 6 and 10). The contract is valued at 30.9 million euros.
This project includes the construction of new platforms at the c...