Castellón Port Basin
LEER MÁSThe Castellón Port Authority has awarded FCC phase one of the job to build the new south basin for the port of Castellón. The job consists of the construction of the breakwater, the initial alignment of the closing dock, and a yard.
The breakwater will be 465 meters long. The closing dock, 338 meters long, will be made ...